Davidson Wood Phase 2



Project Status



Recent Updates

The Construction Drawings for Phase 2 of Davidson Wood were approved by the Town and Mecklenburg County in 2017, but have expired. The developer will need to re-submit Construction Drawings for approval before the project can begin. The development will initially connect through Bailey Springs, until the bridge to the first phase of Davidson Wood is completed. 


  1. Site Info
  2. Documents
  3. Contact

Site Info


  • Planning Area: Neighborhood General
  • Project Location: Davidson Hall Phase 2 is located at the southern terminus of Samuel Spencer Parkway
  • Parcel ID: 00709102
  • Acres: 32 +-
  • Development Description: A continuation of Davidson Wood Phase I, this is a single-family residential phase including 41 homes on 32 acres, with 14.21 acres of preserved open space (40% of site). Roadway connections are via Samuel Spencer Parkway, Park Terrace Lane and Bradford Park Drive. A greenway connection will also be provided to the Kincaid Trail from this phase of development.
  • Developer: Artisan Custom Homes